Line Painting · King City

Line Painting & Pavement Markings in King City

King City line painting is institutional work — the Seneca King campus, Country Day School, Villanova College and the Kingbridge conference centre.

5.0 · 27 Google reviews

Campus lots are large and used in bursts, which makes clear circulation more important than raw stall count. A layout that works at 8am and fails at 4pm is not a layout.

Schools carry particular requirements: bus loading zones, drop-off sequencing, fire routes and accessible parking all in the same constrained space. Those are set out to code before paint moves.

Term timing decides everything here. We paint over reading breaks, summers and weekends, and let paint cure properly before students return.

We pave, pour curbs and paint markings ourselves, so a campus deals with one crew and one schedule. Insured to $5M.

Around the Dufferin Marsh and the Schomberg village sites the lots are small and seasonal, and layouts there have to work for events as well as ordinary weekdays.

We handle line painting across King City — including King City core, Nobleton, Schomberg, Kingscross, and the Dufferin Marsh area, and the streets and properties around the Seneca King Campus, the Mary Lake Monastery, and the Oak Ridges Moraine trails.

Our line painting work near King City

View all our projects

Magnum Paving is an asphalt paving contractor serving King City and the Greater Toronto Area. The company runs its own in-house crews, carries $5,000,000 in liability insurance, and holds a 5.0-star rating from 27 verified Google reviews.

What's included

  • Optimized layouts that maximize usable stall counts
  • Code-compliant accessible stalls and access aisles
  • Fire routes, stop bars, and directional arrows to spec
  • New striping and re-striping over faded lines
  • Durable traffic paint applied for a crisp, lasting finish

Frequently asked questions

Can you re-stripe our lot over the existing faded lines?
Yes. We clean the surface and re-stripe over the existing layout, or redesign the layout if you want more stalls or better traffic flow. Either way the new lines go down crisp.
Do you mark accessible stalls and fire routes to code?
We do. Accessible stalls, access aisles, fire routes, and signage markings are laid out to current code so the site passes inspection.
How long before we can park on fresh lines?
Traffic paint dries quickly — usually within an hour or two in good conditions. We'll give you a clear window before the lot is ready for vehicles.

Ready to pave in King City?

Free estimates across King City & the GTA · $5M Liability Insurance · Fully insured.

Free Estimate

Let's get your project graded right.

Tell us about the job and we'll send a free, detailed quote — usually within one business day.

Follow our work

📷 Got a photo of the job? Text it to (416) 728-9992 for a faster quote.

We'll never share your information. We typically reply within one business day.

Call Text FREE ESTIMATES