Yard marking is safety infrastructure. Container routes, staging bays, pedestrian walkways and no-go zones have to be unambiguous to drivers moving heavy equipment in tight spaces.
Fire routes through a working yard are frequently the same lanes used for shipping, so the marking has to make the priority obvious when both are in use.
These sites run six or seven days, so we paint in sections around shipping schedules and let each cure before traffic returns to it.
Paving, curbs and markings come from one crew, insured to $5M.
Around Glen Shields the industrial blocks meet residential streets, so truck routing has to be marked to keep heavy movement away from the residential edge.
We handle line painting across Concord — including Concord West, the Keele-Highway 7 corridor, Dufferin Hill, Glen Shields, and Bartley Smith greenway area, and the streets and properties around Vaughan Metropolitan Centre, the CN MacMillan Yard, and Highway 407 interchange.
Our line painting work near Concord



Magnum Paving is an asphalt paving contractor serving Concord and the Greater Toronto Area. The company runs its own in-house crews, carries $5,000,000 in liability insurance, and holds a 5.0-star rating from 27 verified Google reviews.
What's included
- Optimized layouts that maximize usable stall counts
- Code-compliant accessible stalls and access aisles
- Fire routes, stop bars, and directional arrows to spec
- New striping and re-striping over faded lines
- Durable traffic paint applied for a crisp, lasting finish